Inside Aba

Fire Outbreak at Geometric Aba Power as Management Issues Statement

The management of Geometric Power (a.k.a) Aba Power Limited, Nigeria’s foremost integrated power company, on Monday, 10th March, 2025 issued a statement reporting a fire outbreak at the company’s premises. The fire outbreak, according to the statement occurred in a temporary building in the premises of Geometric Power located in the Osisioma Industrial Layout, Aba, […]